SAPROLITE GOLD CONCENTRATOR

RIG DESIGN

Key Points:

  • – Design of a modular saprolite gold concentrator plant
  • – Modularization for inland water transport
  • – Integration of all equipment required
  • – Structure calculation
  • – Electric loads calculation
  • – Construction follow up
  • – The project has been performed in a “fast track”, concept, design, and construction have been performed in 13 weeks only.

key facts

  • Construction: Spain
  • Clients / PartnersNG²
  • Project Phase: Basic and detailed engineering, Construction follow up
  • Contract Start/Finish:  2013